Skip to product information
1 of 1

barkavenue

BARK AVENUE Heavy Duty Black Anti-Tangle 2.5m Double Clip Long Lead

BARK AVENUE Heavy Duty Black Anti-Tangle 2.5m Double Clip Long Lead

Regular price £49.99 GBP
Regular price Sale price £49.99 GBP
Sale Sold out
Tax included. Shipping calculated at checkout.

Introducing the revolutionary BARK AVENUE Climbing Button Carabiner Clip Lead. 

Extra long 2.5m length for further exploring. 

A durable clip has been reinforced at each end of the lead for added security. A ‘twist and push’ action needs to be completed to open and close the attachment parts of either end or the lead. 

Can be used alongside the BARK AVENUE dog walking bag or used as a lead - one side can be looped around and clipped back onto the lead to create a handle. 

The revolutionary button carabiner clips are extremely hard wearing. These are traditionally used in climbing and we have reinforced them onto high quality strong padded neoprene for ultimate strength and comfort. 

Feature swivel component for anti-tangle dog walking. 

Also available in Orange 

* BARK AVENUE dog walking bag and double splitter extender to be purchased separately. Whilst extra care has been taken to ensure high quality of mental hardware, black powder coating will always corrode when open to elements and impact. 

Materials

Shipping & Returns

Dimensions

Care Instructions

View full details